9 Reasons to HireOwner's Rep

Every one of these started as a sentence an owner said out loud. If you recognise yourself in any of them, that's the reason.

Architectural floor plan showing room layouts
01

Feasibility Study / Due Diligence

  • “Is there someone (who understands construction) who can create the proforma for my project and see it through to completion?”
  • “Does my new use comply with local codes & zoning?”
  • “Are there grants available for my project?”
Blueprints and drafts with stationery on a desk
02

Cost Estimating / Monitoring

  • “Can I afford this property/building AND the cost of construction?”
  • “My project is in danger of Change Order overload.”
Two construction professionals discussing a project on site
03

Design and Construction Team

  • “I have a great _________________ (builder, architect, banker), how can I round out my team for a successful project?”
  • “What’s the best delivery method for my project? Design Build, Guaranteed Maximum Price, Lump-Sum Agreement, Cost Plus, Construction Manager / General Contractor / Both.”
Architects reviewing detailed schematics
04

Initial Decision Maker – IDM

  • “I’d like to have a 3rd party on standby.”
  • “We have a legitimate claim and need an objective decision/opinion.”
  • “Our agreement calls for an independent Initial Decision Maker.”
Two colleagues in safety gear talking on a building site
05

Owner Advocacy

  • “I’d like someone to be my advocate during construction while I run my business.”
  • “Who’s watching my construction costs?”
  • “Our company is moving and we can’t afford ‘down time.’”
Close-up of a floor plan showing layout precision
06

Value Engineering

  • “Can I substitute materials or methods and still afford my project without jeopardizing it’s integrity.”
Hand drafting a blueprint in a workspace
07

Dispute Resolution

  • “My project is stalled.”
  • “I want some additional work but want to minimize any schedule delays/changes.”
Engineer checking a wall with a spirit level
08

Project Close-out

  • “Is there a 3rd party who can certify Substantial Completion?”
  • “This will require forensic construction accounting.”
Engineer examining a large construction framework
09

Progress & Completion Inspections

  • “Our bank needs a professional inspector to determine the percentage of completion for our construction projects.”
  • “Am I getting what I wanted and what I’m paying for?”

Recognise any of these?

Most owners call after the third one. Calling after the first is cheaper.